Go To Search
Stay Connected
FacebookTwitterYoutubeLinkedInRSSMobile
Tahoe Valley Stormwater Improvement Project
The Tahoe Valley Stormwater Improvement Project includes much of the densely developed commercial areas near U.S. Highway 50, both north and south of the “Y”. The area is a priority for treatment as storm water runoff discharges directly to the Upper Truckee River, which drains to Lake Tahoe.  The project includes design of water quality improvements to reduce pollutant loads discharged to the Upper Truckee River.