Sierra Tract Erosion Control Project, Phases

The Sierra Tract ECP, Phase 3 & 4 project includes design of water quality improvements for commercial portion of the Sierra Tract subdivision immediately adjacent to U.S. Highway 50 and the southwestern residential portion of the subdivision.  Storm water from the project area drains directly to the Upper Truckee River, which drains to Lake Tahoe. 

Project Manager: Stan Hill
Status: design
Schedule: 2015-2016


For more information, view the Project Workplan which includes a project description, detailed maps and analysis of the REDUCTION of fine sediment produced within the project area that flows to the Upper Truckee River.


Engineering Plans 
- Complete set of Final Plans for the project. This is a large file and may take a minute or two to load. 

CEQA

NEPA