Phase 1 began in May 2008.  This phase will move forward with the design for the waterfront and will include a detailed technical analysis of the environmental constraints of the project site, design development to mitigate environmental impacts of the design, and the preparation of construction drawings for the eventual implementation of the new design.

This phase will include innovative water quality measures as well as numerous improvements to the recreational features of the site:

  • various measures to protect water quality in Lake Tahoe including storm-water infiltration areas, pervious paving, and stabilization of the bluff to reduce erosion at the lake edge.  
  • enhanced beach access
  • terraced seating areas for lake viewing
  • improved picnic and bbq areas
  • a small building with concessions for food
  • a small building for non-motorized water crafts
  • a cantilevered lake overlook
  • an upgraded Class I bike path
  • a new waterfront plaza for community recreation
An Initial Study/Negative Declaration (IS/ND) has been prepared which describes the environmental impacts of the proposed El Dorado Beach Improvement Project at Lakeview Commneons.